ملف الشركة

ملف الشركة
March 07, 2024
Category Connection: علبة التروس حفارة
قطع الغيار عالية الجودة من الحفر من الصين
https://www.excavatorreplacementparts.com/china-excavator_de08_roller_bearing_24940310_for_doosan-43284886.html
(غوانغتشو شوجونغ) شركة تصنيع أجزاء الآلات من الصين
يمكننا توفير:
قطع غيار الحفار: https://www.excavatorreplacementparts.com/supplier-excavator_replacement_parts-339304.html
أجزاء الحفر: https://www.excavatorreplacementparts.com/supplier-excavator_parts-334863.html
أجزاء حفر هيتاشي: https://www.excavatorreplacementparts.com/supplier-hitachi_excavators_parts-337440.html
مرحبا بكم في زيارة موقعنا الرسمي: http://www.excavatorreplacementparts.com
Brief: Discover the LongKing CDM6225 MBEB230 Excavator Travel Gearbox Reducer, a high-quality OEM replacement part designed for excavators. With a 6-month warranty and multiple payment and shipping options, this gearbox ensures reliable performance. Ideal for international trade, it's available for trial orders with fast delivery.
Related Product Features:
  • OEM quality excavator travel reducer with a 6-month warranty.
  • Model number CDM6225, compatible with various excavator models.
  • Frame install holes: 30, sprocket install holes: 30, shaft teeth: 23.
  • Available for trial orders with a minimum order quantity of 1PC.
  • Multiple payment options including Western Union, Bank, PayPal, and Alibaba.
  • Fast delivery options via DHL, FedEx, TNT, UPS, Air Shipping, or Sea Shipping.
  • Place of origin: China (Mainland), shipped from Guangzhou or as requested.
  • Compatible with various travel motor assemblies and gearboxes.
الأسئلة:
  • How is the quality of the LongKing CDM6225 MBEB230 Excavator Travel Gearbox Reducer?
    It offers OEM quality with a 6-month warranty and is all new.
  • What are the payment methods available for purchasing this gearbox?
    You can pay via Western Union, Bank, PayPal, or Alibaba.
  • Can I buy just one piece of the gearbox, and what is the delivery time?
    Yes, a trial order of 1PC is welcome. Delivery takes 1-3 days for stock items and 3-7 days for non-stock items.
  • What should I do if I don't find the part I need on your website?
    Email us the part number or nameplate, and we will provide a quote accordingly.
Related Videos

محرك سوينغ حفارة

ملف الشركة
March 06, 2024

ملف الشركة

ملف الشركة
May 25, 2023

الأجزاء الهيدروليكية

أجزاء حفارة هيدروليكية
March 06, 2024

TB175 K3SP36C

مضخة هيدروليكية
June 17, 2022

Swing Motor For DH80 Excavator

محرك سوينغ
June 29, 2021

وحدة تحكم المحرك جهاز تحكم كمبيوتر ECU

قطع غيار حفارة كهربائية
March 09, 2024